Use the Dashboard
Start work, review compliance progress, and find assignments that need attention.
Open Dashboard and check the workspace named in the welcome card. The Dashboard uses your access and licenses in that workspace to choose the actions and information shown.
Start work
Select Start work in the welcome card. Choose an offered action. Some actions take you straight to a page; others ask you to create or choose a project. Select the project you intend to work in before continuing. Use the back control in the project picker or creation dialog to return to the launcher.
If an action is absent, check your project access, workspace role, and feature licenses. For personal details, select View profile.
Read compliance status
Compliance status summarizes accessible standards when your workspace has the required management-system access. Overall progress shows requirements met, Evaluated shows requirements checked, and Documented shows requirements backed by a document. Read the counts beneath each percentage and any out-of-date evaluation count.
Select a standard to inspect its details, or View all standards to open the standards area. If no standards are tracked, use Add a standard when offered or ask someone with the required access. An unavailable license or denied-access state needs an access check. A loading error offers Retry; a refresh warning means the page still shows previously loaded figures.
Find work that needs attention
Under Needs your attention, choose My work to review your assignments. Workspace admins and owners can also open Workspace operations when available.
- Search with Search work items.
- Narrow results with Status, Due, Priority, and Kind. Use the management-system scope controls when you need work from a particular system.
- Select Active, Overdue, Today, or This week to apply the corresponding work window.
- Open a result to inspect and complete its work in the relevant feature. Use pagination for more results.
Use Reset view to remove criteria when a result is missing. Retry summary reloads unavailable summary counts. A summary or source warning can mean the available results are incomplete; review the warning before treating an empty result as no outstanding work.
Continue recent work
Recent changes shows recent active changes from accessible projects and management systems within the last 30 days. Select Browse activity history and use the full Activity filters. If recent changes fail to load, use the section's Retry control.